Traffic device for works at Corso Vittorio Emanuele in Naples until May 2018

Corso Vittorio Emanuele in Naples

Here are all the info of the traffic device that affects Corso Vittorio Emanuele in Naples until May 2018 for Enel works.

From today 12 March 2018 start some road works in the Corso Vittorio Emanuele in Naples and up to May 14 they will limit their stay on a stretch of road.

These are necessary interventions that must be carried out Enel company and, specifically, in the section between Piazzetta Cariati and Piazza Mazzini. They are used to upgrade the electricity distribution network and will be held with a mobile site of about 50 meters. This will be found starting from Piazzetta Cariati and will occupy part of the carriageway, so the circulation will not be interrupted, but the stop will be prohibited from time to time on both sides of the road.

Furthermore, in the sections that are affected by the mobile construction site, the alternating one way. Here are the details.

Traffic device at the Corso Vittorio Emanuele

  • the alternating one-way street will be active from 07.30 to 17.00, in the sections from time to time affected by the works that will proceed for portions of the road no longer than 75 meters in the straight sections and
    not higher than 50 m in correspondence of curves and near the semaofers
  •  the parking ban with forced removal on both sides, from 50 meters first to 50 meters after the sections
    interested in the workings
Follow us on Telegram
Written by Fabiana Bianchi
Let's talk about:
They may also like