Jobs in sight for Via Diocleziano to Fuorigrotta.
The pavement of this road, as well known drivers, is studded with holes that are difficult to avoid and which cause damage to the vehicles passing through the area. The situation has now become unsustainable, but from Monday 18 February 2013 work will begin that will restore the asphalt of the two semicarreggiate.
Assert that the road will be closed to traffic it is not entirely accurate, in fact, the yard will distribute the works in order to interest one single track at a time, occupying only 150 meters of the latter. The transit will be regulated by special traffic lights and by the employees who will manage the passage of cars.
In the previous section and in the following section of the portion of the road on which the yard will operate, it will not be possible to park, it will start up forced removal if the Do not stop it should not be respected.
The works will last 35 days, until 24 March 2013, and during this time la bus stops and the garbage cans will be moved to neighboring areas.